This is just a placebo proposal (effectively does nothing at the moment) to test if the whole Flow works and DAO is able to control and manage Procotol Contracts after ownership transfer is done.
This proposal sets protocol fee to zero (which is the case currently, so no changes are to be made)
To make it happen Timelock contract should call UpgradeExecutor contract ( 0 xb 23 BCD 4 F 668365 B 1 c 9 Ec 4 B 4 DF 79915 bF 8 c 76 C 5 b 5 )
it should call execute function
upgrade address should be 0 xcaC 1 fE 02 cB 051672 D 93 eE 390136 B 8 E 10301 B 6709 (SetProtocolFeesAction)
calldata should be 0 x 828 bd 7 fe 000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000
value should be 0
image 1720 × 1466 186 KB